ProPricer BOE Pro Ideas
ADD A NEW IDEA

All ideas

Showing 90

BOE Pro ONLY required global resource fields

Description: Need a way to make Global Resource Fields required in BOE Pro but not required in Contractor Edition (CE). Use Case/Example: I have global fields that estimators must fill out. However, some CERs do not use those fields in CE.
Guest about 4 hours ago in  0 Planned

Add Proposals I own to the My Proposal list on the dashboard.

Description: Add all the proposals I own to the list of My Proposals on the dashboard Use Case/Example:
Guest 26 days ago in  0 Planned

Set a default Curve or require the user to select a Curve when entering an estimate.

Description: The ability in CE to set a default Curve is needed in BOE Pro; the default curve can also be blank, requiring the use to select one. Use Case/Example:
Guest 5 months ago in  0 Planned

Add formula total to the total to the BOE text

Description: Include the total in BOE text. Use Case/Example: Right now, the user has to manually add the total number to the BOE text, and if the calculation is updated, the total is not also updated. The calculation needs to automatically includ...
Guest 5 months ago in  0 Planned

Include Access Tags from the user when creating from a proposal template

Description: Include Access Tags from the user when creating from a proposal template. Use Case/Example: Right now, the users Access Tags are not added to the proposal when creating from a template. Only the template access tags are added to the p...
Guest about 2 months ago in  0 Planned

Auto Numbering for PBS and Task.

Description: Need the ability to auto number for a specific PBS level and have the Tasks under that PBS level auto number. Dragging a PBS to a different location/order will update the numbers and the task numbers under it. Counting from top to bot...
Kenny Louden 3 months ago in  0 Planned

Workflow at the Task Level.

Description: The ability to assign the workflow at the task level. The ability to assign review and approval steps for the workflow from the people assigned to the PBS when creating a task. Use Case/Example: The BOE Author will create a task for t...
Guest about 2 months ago in  0 Planned

Option to force RAM assignment to first step on PBS creation.

Description: Currently, when a user creates a PBS, they are automatically assigned to all workflow steps for which they appear in the workflow. An option is needed to create a new PBS to force the creator to be assigned only to the first step. Use...
Heather Neiger 2 months ago in  0 Planned

Proposal Level Permission Overrides

Proposal Level Permission Overrides like CE. Implement Proposal-Level Permission Overrides in BOE Pro similar to those in Contractor Edition (CE). This feature will allow users to set specific permissions at the proposal level, enhancing control ...
Heather Neiger 6 months ago in  0 Planned

Skill Mix Table in the BOE

Description: The table needs to show the mix of the resources used in the ledger data. (Individual-Resource Hours / Total hours) The table should also show the skill mix of estimated resources. Use Case/Example:
Immanuel Bowen 4 months ago in  0 Planned