Skip to Main Content
ProPricer BOE Pro Ideas
ADD A NEW IDEA

All ideas

Showing 168

The ability to drag a task to another PBS

The ability to drag a task to another PBS. The task cannot be moved if it is connected to a BOE at the PBS Level.
Aaron Hale about 2 years ago in  0 Planned

Bring Back Duration Type Proposals

Bring Back Duration Type Proposals
Aaron Hale over 1 year ago in  0 Planned

Notifications on Proposal Submit

Description: The ability to notify the proposal managers and CCed by email when a proposal is submitted. Use Case/Example: Pricing does not always know when the proposal was submitted. Notify the right people when a proposal is submitted.
Aaron Hale 10 months ago in  0 Future consideration

Multiple signers per workflow step

When there are multiple people assigned to the same Workflow Step, allow the selection of the required signers. Should be able to select all or some of the people on the step.
Aaron Hale over 1 year ago in  0 Planned

Rate Modifiers Available in BOE Pro

If the proposal in CE uses rate modifiers, make these items available for the estimator in BOE Pro to select.
Aaron Hale almost 2 years ago in  0 Planned

Scheduled Rates Available in BOE Pro

Scheduled Rates Available in BOE Pro
Aaron Hale almost 2 years ago in  0 Planned

Quick Add for SOW to PBS

The ability to quickly add (Copy Paste) the SOW to multiple PBSs at one time.
Aaron Hale almost 2 years ago in  0 Planned

The ability to enable and disable auto calculations at the proposal properties/template level.

The ability to enable and disable auto calculations at the proposal properties/template level.
Aaron Hale almost 2 years ago in  0 Planned

Be able to place a limit on the number of characters allowed on a BOE Sections

Be able to place a limit on the number of characters allowed on a BOE Sections.
Aaron Hale about 2 years ago in  0 Future consideration

Add variables to Expressions in Calculations. Variables can point to single a BOE Total Direct Cost (or Total Price) or several.

Add variables to Expressions in Calculations. Variables can point to single a BOE Total Direct Cost (or Total Price) or several.
Aaron Hale about 2 years ago in  0 Future consideration